Horizontal / Cross-Industry
EAM / CMMS / Calibration / Validation (standalone)
EAM / CMMS / calibration / validation (standalone) — equipment calibration, qualification, and breakdown/repair tracking (Golden Demo #6).
This reference implementation is explored via internal system login rather than a public website — everything below is real, verified detail about what it actually contains.
What this demo proves
7 real, documented test scenarios verified against this reference implementation, including:
- Preventive maintenance auto-schedules
- Overdue calibration is visible and queryable
- A breakdown creates a real repair work order
- Spare-part consumption is recorded on the repair
- A qualification (IQ/OQ/PQ) links to specific equipment
- Equipment can't be qualified or used while its calibration is overdue
- Full equipment service history is retained
Business flow
Built almost entirely on native ERP asset-management machinery plus two new records (Calibration Record, Qualification): a passing calibration lets an equipment qualification succeed; a real breakdown (a drive-belt failure) creates a repair consuming a spare part; a second qualification attempt against deliberately overdue calibration is correctly blocked.
Real issues found while building this demo
Radical transparency: these are real engineering incidents from this demo's own build, not illustrative examples.
- A "latest calibration" lookup ordered by the wrong date field, which could have let a block-worthy qualification through — caught before it ever ran live.
Engineering Evidence
For technical reviewers: the exact test IDs, seed data steps, and platform engines behind the claims above. Click to expand.
Golden Demo #6
Every test ID and what it verifies:
- E01Preventive maintenance auto-schedules
- E02Overdue calibration is visible and queryable
- E03A breakdown creates a real repair work order
- E04Spare-part consumption is recorded on the repair
- E05A qualification (IQ/OQ/PQ) links to specific equipment
- E06Equipment can't be qualified or used while its calibration is overdue
- E07Full equipment service history is retained
Real seed data steps
4 real seed steps ran, in order, to build this reference demo's data:
- 10EAM Calibration E02 (DP-543)Master data
- 20EAM Qualification E05/E06 (DP-544)Transaction
- 30EAM Breakdown Repair E03/E04 (DP-545)Transaction
- 40EAM Validations E06 (DP-546)Transaction
IP-EAM · Golden Demo #6